Malaba–Angurai–Malakisi Road Upgrade Project
The Malaba–Angurai–Kakampe & Angurai–Rwatamai–Malakisi Road Upgrade Project (RWC265) was a 35 km two‑lane asphalt highway completed between June 2017 and October 2020 at a cost of USD 16.03 million, delivered by New World Engineering. It involved major civil works including culverts, cement stabilization, and double surface treatment .
Key Project Components
Earth & Stone Engineering — excavation, grading, and base preparation.
Pipe & Box Culverts — drainage structures to manage stormwater.
Cement Stability Layer — reinforced soil base for durability.
Double Surface Treatment — asphalt surfacing for smoothness and longevity.